Road Closures
Road Closures and Diversions A road passing under the N7 Nenagh Bypass will be reduced to one lane
for a period of four months. Flagmen and traffic lights systems will be
in operation to regulate traffic flow. Newport Road - Lahesseragh Bridge There is a local diversion on the Newport Road (R504) at Cooleen.
Temporary stoppages of approximately 10 minutes occur on the R504 (Birdhill to Newport) at Cooleen when quarry blasting takes place.
Newport interchange (Finnegan's roundabout) has a new layout in place.
There will be a road closure from 29th September
2008 to 3rd November 2008, 5 weeks total, on the L-2133-0 with
diversions via R499 & N7.
There
will be a closure as part of Thurles Interchange completion works
L-6077-0 (Knockalton) from the junction with R498 for a distance of 400
metres, due to take place from 6th October 2008 - 29th December 2008.
There will be a closure at RC 19
L-21330-0 - Castlecranna, Carrigatogher, Nenagh, due from 29th
September 2008 - 3rd November 2008.
Cappadine
Road will be closed from 20th October 2008 - 1st December 2008, with
alternative routes via L-6034-0, N7 - R499 and R499 N7, L-6034-0.
LP-1110
at Gardenhill, Castleconnell will be closed from Tuesday 28th October
2008 at 8.00am until Sunday 2nd November 2008 at 5.00pm.
Quarry Blasting
Blasting at Touknockane quarry in Cooleen on the Birdhill to Newport R504
occurs most Tuesdays and Thursdays at 15.40 hours.
Blasting schedule for October/November 2008 is
Tuesday 28th Oct
15.40 Thursday 30th Oct
15.40
Tuesday 04th Nov
15.40 Thursday 06th Nov 15.40
Tuesday 11th Nov
15.40 Thursday 13th Nov 15.40 Tuesday 18th Nov 15.40
Thursday 30th Nov
15.40
Due to operational issues dates may vary and will be posted on a VMS
Variable Message Sign at the quarry. Local residents are notified of each
weeks schedule by letter. Occasional second blasts take place 30 minutes
after the scheduled blast. Local residents are informed by weekly of the
blast schedule.
Blasting is also occurring in Ballinahinch but no roads are affected.
Traffic Management
Flagmen are in place on all road crossings which are in use.
On the existing Nenagh bypass
there is a temporary speed limit of 60 Km/h where cones are in place.
Overtaking is restricted and there is an Emergency Breakdown service in
place (087 361 6652). A new section at the Dublin end is open to the new
semi permanent layout.
There
is an ongoing temporary speed limit of 60 Km/h on the N7 near
Mulrooney's service station where a bridge is being built across the
N7.
A temporary speed limit of 50 Km/h is in place 200m meters north, south and west of the Killaloe Road junction of the N7 at Birdhill and a new road layout is in place incorporating the new roundabout.
A temporary speed limit of 50 Km/h is in place on all approach roads to the Newport Interchange (Finnigans roundabout) and a new road layout is in place.
There is a temporary speed limit of 55 Km/h for construction traffic on
the R504 Newport Road from Birdhill to Cooleen.
|